The bridge linking Mai Chi Tho street to Kim Cương (Diamond) Island will go from Thanh My Loi residential area to Thu Thiem New Urban Area.
The four-lane bridge is 291 meter long and 22 meter wide with a total investment capital of VND493 billion.
The bridge is expected to be finished before April 30 next year.