Director of Transport Department of Quang Binh province Pham Quang Hai said that the cable-stayed bridge had total length of 515.2 meters.
It is the second cable- stayed bridge followed by Rach Mieu Bridge in the Mekong Delta
It was designed with four lanes.
This is the second cable- stayed bridge followed by Rach Mieu Bridge in the Mekong Delta under main investor of the Ministry of Transport.
Nhat Le 2 bridge is considered as one of the province’s key infrastructure projects contributing to promote development of tourism potentiality for Bao Ninh peninsula and Dong Hoi city; attracting domestic and foreign investments and business opportunities.
This is the second cable- stayed bridge followed by Rach Mieu Bridge in the Mekong Delta under main investor of the Ministry of Transport.
Nhat Le 2 bridge is considered as one of the province’s key infrastructure projects contributing to promote development of tourism potentiality for Bao Ninh peninsula and Dong Hoi city; attracting domestic and foreign investments and business opportunities.
Vietnamese Prime Minister Nguyen Xuan Phuc attended the opening ceremony.