In particular, the city People’s Committee informed studying methods to organize traffic at both bridge piers, solutions to access transport for the project; combining between the existing transport system and the future one as soon as the construction project of Ton Duc Thang Street and Bach Dang Park will have been completed.
Accordingly, the pedestrian bridge is expected to be located near the Ho Chi Minh Square.