The three packages have the total length of 25 kilometers, designed to meet A standard with the speed of 100 kilometers an hour.
Ben Luc-Long Thanh expressway runs from the Mekong Delta province of Long An, travels through Ho Chi Minh City and links up to the southeastern province of Dong Nai.
The work started on the 51.7 kilometer project in July 2014 with the total capital of VND31.3 trillion (US$1.38 billion).