Every station has two storeys and a length of 137 meters connecting with pedestrian overpass over the Hanoi highway.
The line No. 1 consists of 11 stations, including Van Thanh, Thao Dien, Rach Chiec, Phuoc Long, Binh Thai, Thu Duc, High-tech Park, Suoi Tien, Tan Cang, An Phu ...
Metro Line No. 1 runs abut 20 km from Ben Thanh to Suoi Tien, passing through Districts 1, 2, 9, Binh Thanh, and Thu Duc in Ho Chi Minh City and Di An district in Binh Duong.
The line is expected to open in 2020, including 2.6 km of underground line with three stations and over 17 km of elevated line with eleven stations with total capital of US$2.49 billion.